Before & after
Drag the handle. See the difference.
Every photo is our own work around Teesside, the North East and North Yorkshire. Where we’ve got a proper before-and-after pair you can drag the slider; the rest are straight from the job. Got something similar? Send us a photo.
- Kitchen wall damp strip-out and re-plaster A kitchen wall below the tiles was stained and blown with damp. Stripped back, treated and re-plastered to a flat, dry finish ready for the new units.
- Bathroom skylight reveal A new roof window in a panelled bathroom needed a plastered reveal. Boarded, beaded and skimmed so the light falls cleanly down onto the basin.
-
Living room strip-out and full re-board Every wall stripped of failed plaster and wallpaper, ceilings re-boarded through the living room, kitchen and bathroom, ready for skimming throughout. -
Ensuite ceiling patch and skim A stained, peeling patch of ceiling above a shower repaired and skimmed, with advice on extraction so the condensation does not bring it back. -
Rear extension prepared for render A two-storey rear extension and chimney scaffolded, the brickwork cleaned down and prepared for a full render, from the ground floor up to the roofline. -
Bathroom ceiling re-board A sagging bathroom ceiling taken down and re-boarded over the existing tiles, ready for skimming and a new light fitting. -
Chimney breast damp strip-out Damp plaster around a fireplace hacked back to brick in a cottage living room, the wall treated and left to dry before re-plastering.